Construction of Industrial Avenue started672
Issuing time:2013-12-13 18:18 Our company started construction on the Industrial Avenue in Maoming High-tech Industrial Development Zone. The section is 6407 meters long and 70 meters wide. The total investment is about 140 million yuan and the construction period is 300 days. It is expected that the entire line will be completed and opened to traffic in the middle of next year. The Industrial Avenue of Maoming Petrochemical Industrial Zone is a fast channel connecting the three major groups of Maoming City (the north group, the south group, and the east group) and the freight trunk road to the western industrial zone. It starts from Wenchong District of Petrochemical Industrial Park to the north, passes through Maonan Industrial Park, Petrochemical Industrial Park 1st Zone and Industrial Transfer Park, and connects to Maoming Avenue in Gaodi Area in the south, and the auxiliary road connects to the existing Maoshui Highway in the north, and passes Industrial Avenue to the south During the construction period, the road section will be connected to the new 325 National Road to be rerouted. It passes by Miliang Highway, Ethylene Maintenance Highway, Ethylene Industrial Pipe Gallery, Mao Petrochemical Ethylene Railway Line and Daren River. The full width of the road cross section is 70 meters: it is composed of 8.75 meters (green belt) + 7.5 meters (auxiliary road) + 37.5 meters (green belt) + 7.5 meters (auxiliary road) 8.75 meters (green belt), and the pavement structure layer is asphalt Concrete pavement. Maoming High-tech Industrial Development Zone is the petrochemical industry base of the National Torch Plan. Relying on Maoming's strong petrochemical industry advantages and good port conditions, it focuses on the development of petrochemical mid- and downstream industries. The park is planned in accordance with the strategic thinking of "unified planning, step-by-step implementation, key breakthroughs, and rolling development" and the development concept of "five integrations". The supporting conditions and public works required for the development of petrochemical industries are all available. The industrial avenue runs through the entire industrial development zone. Its completion will greatly accelerate the development of petrochemical industries. |