Tianyuan Petrochemical Logistics-Train loading and unloading special line track is fully connected650
Issuing time:2019-01-18 20:15 At 4:30 pm on January 18th, Tianyuan Petrochemical's 4 million tons/year dedicated train line project-the railway line was completed. A train locomotive with colored ribbons and red flowers slowly drove into the loading and unloading line of Tianyuan Petrochemical. Tianyuan Petrochemical Logistics-Railway Dedicated Line Engineering facilities have a total investment of 150 million yuan, designed by West China Engineering Design Institute and constructed by China Railway 22nd Bureau Harbin Company. After half a year of construction, the old rail demolition and new rail laying work have been completed and completed Laying of the monolithic track bed for the loading and unloading line, and the whole line is opened to traffic today. The dedicated line has 54 crane positions and will be put into use at the same time as Tianyuan Petrochemical's propylene plant in May this year, which will greatly improve the company's raw materials and product logistics conditions. The Tianyuan Petrochemical Logistics-Special Railway Line Project can also provide train loading and unloading services for Maonan Petrochemical Industrial Park enterprises, greatly improving the logistics efficiency of Maonan Industrial Park. |